Public Comment Form

CyrusOne Data Center, Quincy. Air Quality Draft Permit. Comment Period: May 9 - June 17, 2019

CyrusOne is a colocation data center, meaning that CyrusOne owns data centers in which other companies lease space for servers and other computing hardware. Their corporate address is 1649 West Frankford Road, Carrollton, Texas, 75007. CyrusOne proposes to construct and operate a new data center complex in Quincy, Washington. The proposed complex will be located in Grant County at 1025 NW D Street in Quincy.

To ensure uninterrupted electrical power supply, CyrusOne proposes to use:
- Forty 2.25-megawatt diesel powered emergency generators to provide backup power to server buildings.
- Two 750-kilowatt diesel powered emergency generators to provide backup power for the administrative and support functions of the data center complex.

Although the proposed engines will only operate over a limited time (up to 38 hours per year per engine) two toxic air pollutants -  diesel engine exhaust particulate matter and nitrogen dioxide - may be emitted at rates that exceed screening thresholds. As a result, CyrusOne submitted a health impact assessment describing the increased health risks from their potential emissions. 

The Department of Ecology determined this proposal satisfies the requirements of Chapter 173-400 WAC. The public is invited to comment. 

View project documents online, or at Quincy City Hall, 104 B Street SW, or Quincy Library, 208 Central Ave S.

Join us for a public meeting and hearing:
June 13, 2019 at 5:30 p.m.
Quincy Community Center
101 F St. SW, Quincy, WA, 98848


Contact Information

All fields are optional unless otherwise indicated.

Submitted By

First Name (required)

Last Name (required)

Address

City

State

ZIP

Email (required)

Your Comment

Comments are due June 17, 2019 by 5:00 p.m.  Please enter your comments in the "Insert comments" space below. To submit attachments, use the "Upload a File" button. Then hit "Continue" to review your comments.

To submit comments for a group please visit our Commenting Tips webpage.

Next steps: After the close of the comment period, Ecology will review and respond to comments. A link to the final Response to Comments report will be sent to the Quincy Data Centers Interested Parties ListServ email. Subscribe here.

This comment form is for the purpose of submitting a comment to the Washington Department of Ecology. Commenter contact information is optional. Contact information is necessary if you want to receive future notices or responses related to this topic. Any information (e.g., personal or contact info) you provide on this comment form or in an attachment may be publicly disclosed and posted on the internet.

Comments submitted online, by email, by mail, or at the public hearing are equally considered.


View Comments View project documents

*Uploading a file is optional*
You may attach up to five 30 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx. If you experience technical difficulties submitting your comment please contact the person listed at the bottom of this page.


Thank you for subscribing to the CyrusOne Data Center, Quincy. Air Quality Draft Permit. Comment Period: May 9 - June 17, 2019 mailing list.