Public Comment Form

Northport Waterfront Cleanup Action Plan: Comment period 5/2-6/1/22


You are invited to review and comment on the draft Cleanup Action Plan for the Northport Waterfront. All comments are due by June 1, 2022, at 11:59 p.m.


Next steps: After the close of the comment period, Ecology will review and respond to comments. We will send our response to comments document to anyone who provided contact information above, and it will be posted online. After the Cleanup Action Plan is final, the engineering design process for the cleanup will begin. The draft engineering design report will be available for public comment before becoming final.


Contact Information

All fields are optional unless otherwise indicated.

Submitted by Value

First Name (Required)

Last Name (Required)

Address (Required)

City (Required)

State

ZIP (Required)

Email (Required)

Your Comment


Please note that this comment form is for the purpose of submitting a comment to the Washington State Department of Ecology. Commenter contact information is optional. Contact information is necessary if you want to receive future notices or responses related to this topic. To make a comment, please enter comment(s) in the text area. To submit attachments use the "upload a file" button below. Then hit 'Continue' to review your comment(s). Any information (for example, personal or contact) you provide on this comment form or in an attachment may be publicly disclosed and posted online.

*Uploading a file is optional*

You may attach up to five 30 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx. If you experience technical difficulties submitting your comment, please contact the person listed at the bottom of this page.


Thank you for subscribing to the Northport Waterfront Cleanup Action Plan: Comment period 5/2-6/1/22 mailing list.