BNSF Track Switching Facility Feasibility Study


Ecology is providing an opportunity for the public to review and comment on the Feasibility Study Report for the uplands portion for the BNSF Track Switching Facility aka Wishram Railyard Site, located at 500 Main Street, Wishram.


You are invited to:



  • Send your comments to Ecology for consideration. Comments will be accepted July 15, 2022 through August 15, 2022

In 2015, Ecology entered into an Agreed Order (AO) with Burlington Northern Sate Fe Railway Company, the Potentially Liable Person(s) (PLP) for the site, requiring the completion of an Remedial Investigation and Feasibility Study (RI/FS). Ecology approved the uplands RI in 2020. Following approval of the FS, the uplands Draft Cleanup Action Plan (DCAP) will be prepared and available for public review and comment after the final draft is complete. During the RI, the investigation also revealed sediment contamination. Currently, the investigation of the sediments continues and a separate RI will describe the in-water portion of contamination. The overall process for the sediment cleanup unit will follow the same sequence as described above for the uplands.The existing AO incorporates the in-water portion of investigation.


An Agreed Order (AO) is a legal agreement between Ecology and the Potentially Liable Person(s) (PLPs) outlining the expectations, process, and schedule for site cleanup. A Remedial Investigation (RI) shows what types of contamination exist and how far the contamination has spread. A Feasibility Study (FS) outlines a variety of cleanup options to address the contamination by reducing or eliminating the risk to human health and the environment. A Draft Cleanup Action Plan (DCAP) describes the final cleanup action selected for the site from the alternatives presented in the FS.


Contact Information

All fields are optional unless otherwise indicated.

Submitted by Value

First Name

Last Name

Address

City

State

ZIP

Email

Your Comment


Comments are due by August 15, 2022 at 11:59 p.m.


To make a comment, please enter comment(s) in the text area. To submit attachments use the "upload a file" button below. Then click 'Continue' to review your comment(s).


Any information (e.g., personal or contact) you provide on this comment form or in an attachment may be publicly disclosed and posted on the Internet.


Next Steps: After the close of the comment period, Ecology will consider comments received and respond to anyone who provided contact information above. Ecology will hold a public meeting if 10 or more people request one. If no significant changes are necessary after public comment, the FS Report will become final.





*Uploading a file is optional*

You may attach up to five 30 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx. If you experience technical difficulties submitting your comment, please contact the person listed at the bottom of this page.


Thank you for subscribing to the BNSF Track Switching Facility Feasibility Study mailing list.